Advait Energy Transitions secures solar EPC contract

Power Generation May 21,2025

Advait Energy Transitions Limited has been awarded an engineering, procurement, construction (EPC), and commissioning contract worth Rs 1.293 billion from KPI Green Energy Limited. 

This project involves the development of a 67.5 MWp ground-mounted solar plant located at the Khavda renewable park in the Kutch region of Gujarat.

The scope of work includes the design, engineering, supply, and testing of the solar project, encompassing all necessary materials, balance of system components, and associated services required for commissioning. 

The contract has reportedly been awarded to Advait Energy Transitions' subsidiary, Advait Greenergy, and the project is expected to be completed within six months.

It may be noted that, Advait Energy Transitions Limited signed a MoU in February 2025 with Haryana City Gas Distribution (Bhiwadi) Limited to establish a 2,000 metric tonnes per annum green hydrogen plant, which will utilize 15 MW alkaline electrolysers.

Share: