CSMC plans 100 MW solar project to cut water supply power costs

Power Generation Apr 21,2026

The Chhatrapati Sambhajinagar Municipal Corporation is planning a 100 MW solar project aimed at reducing electricity costs associated with water supply operations.
Power consumption for water pumping and distribution is a major expense for urban local bodies, and renewable energy offers a long-term cost-saving solution.
The project is expected to provide a stable and sustainable energy source, while also contributing to environmental goals through reduced emissions.

Share: